0
0
How many such pairs of letters are there in the word SEARCHES each of which has as many letters between them in the word as in the English alphabet ?
How many such pairs of letters are there in the word SEARCHES each of which has as many letters between them in the word as in the English alphabet ?
1). None
2). One
3). Two
4). Three
This Question has 1 answers.
Solution
SEARCHES
In the word, A and C have one letter between them , in alphabetical order A and C have only letter B between them
C and E have one letter between them , in alphabetical order C and E have only letter D between them
A and E have three letter between them , in alphabetical order A and E have three letters B, C and D between them
Therefore, (A,C) ; (C,E) and (A,E) are three pairs which satisfy the given condition.
Option D is correct
Similar Questions
- There are three taps A, B and C in a tank. They can fill the tank in 25 hrs, 20 hrs and 10 hrs respectively. At first all of them are opened simultaneously. Then after 1 hrs, tap C is closed and tap A and B are kept running. After the 4th hour, tap B is a
- In an alloy, zinc and copper are in the ratio 1 : 2. In the second alloy, the same elements are in the ratio 2 : 3. If these two alloys be mixed to form a new alloy in which two elements are in the ratio 5:8, the ratio of these two alloys in the new allow
- Directions: In a family of eight members, there are two married couples and a widow. B, an engineer is married to a doctor. D, an architect is the wife of C. F, a student is the only child of D. H is the son of G and his sister E is the niece of the manag
- Directions: In a family of eight members, there are two married couples and a widow. B, an engineer is married to a doctor. D, an architect is the wife of C. F, a student is the only child of D. H is the son of G and his sister E is the niece of the manag
- A and B can complete a piece of work in 80 and 120 days respectively. They together start the work but A left after 20 days. After another 12 days C joined B and now they complete the work in 28 more days. In how many days C can complete the work, working